Process Description :
: Hydroelectricity generator consist of 2 main parts: Generator and turbine working on Turgo and Propeller principles applied in two areas having different hydrographical conditions.
1. MGH-LH 200/500/1000 used for the area with low head and high flow (standing machine)
2. MGH-HH 200/500 used for the area with high head and low flow (sitting machine)
Standard: Foreign standard
Award: Third prize of Sience and Technology Creative in 1999
Origin: Subject at ministry level.
Reliability: Finished in 1998. Has been sold/transferred to many manufacturers. The total turnover of selling machine (util 5/2003): 1.568 billion VND
|